Each router is classed by the highest backbone it runs and has a vendor. Upgrades
are paid one step at a time and any level paid for can run. Higher levels use
less router CPU, label switching makes pass-through traffic cheaper, Auto-TE and
RouteScript need RSVP-TE or above, and POPs whose routers can't run the backbone
stay outside it. Mixed vendors at the top of what their routers can do get
interop failures. Saves with Auto-TE keep the old rules; puzzles, Architect and
scenarios are unaffected.
The 'Your stars' box at the top counted only the puzzle packs, yet sat above the architect runs and the weekly puzzle. It moves right above the packs as 'Stars from the packs' (what unlocks the next pack), and the architect runs header shows its own total like a pack does. Weekly rows already show their stars. One label renamed in all six languages.
rmLink (a cancelled IRU, your own fiber or a called-off cable) and decommission() dropped links with their channels still plugged in. chBack() puts each optic on the shelf, the same as unplugging it by hand, and a note says how many. One new plural label, in all six languages.
A grow brief raises a site's traffic past what its tubes carry; the reference makes
room by upsizing the busiest tube, or laying a second one where a long cable cannot
grow. Traffic may now reach 380G. The weekly row says when the next run comes out.
scripts/weekly-architect.js picks an HQ in a region the last weeks did not have and
designs each brief against the network a reference architect has built so far, so
every brief asks for something new; the game's own checklist and chaos monkey review
judge it, and the whole run is replayed from the file for three stars. The game
fetches architect/weekly/<key>.json when Puzzles opens, checks it field by field and
writes the briefs' text itself. The Sunday job and the release deploy carry it like
the weekly puzzles and scenarios. Later briefs' cities no longer show early.
When a build earns a new star the monkey snips each trench and cable in turn on the
map, and cities that lose traffic say how much; then the stars show. It can be let
loose again or skipped. Puzzle texts talk about the chaos monkey instead of a backhoe.
Tubes in one trench are drawn as strands of one bundle with an orange '2× one trench'
pill; separate paths bow well apart with a green '2 paths' pill. Cut tubes no longer
show the backhoe: the monkey does the snipping.
Earned on the monkey's first visit instead of any fiber cut; the badge keeps its id,
so ones already earned carry over. Monkey-proof gets a shield. The monkey's cheer
also cancels a spray still pending from its last hop.
No numbered tags beside cities, no "coming up" plan on a city card and no hint
to build there early: you design for today's brief and find out what comes next.
Now and then a chaos monkey moves in for 120 to 240 days and snips a tube every
couple of weeks, weak spots first, instead of the usual random outages. Outlast
it without a customer noticing for a bonus and the Monkey-proof badge, or throw
it a banana. Drawn on the map in shades; gameplay rule F4 with its test.
Under the scenario's new sender rule, Seoul transit carries a sender-pays fee per
Gbps, the Korean incumbents take traffic only over a paid PNI, home broadband pays
less, and Korean users mind any far exit, peering included. The goal asks for
700 Gbps, Seoul 92% served well, 99% reach and a monthly profit. Korea outside
the scenario is unchanged; older Gangnam saves pick up the rule.
Mind the Gap, Cape to Cairo and Order and Progress count cities and IX.brrr ports only
when your network joins them up (island POPs won without crossing anything). Fibre to
the Basement also needs 500 Gbps served (it was won on day 2). Anchors Away: nobody sells
transit in Tallinn, ships really do cut the Baltic links about three times a link-year,
and the 99.5% streak no longer counts Great Firewall losses. In the Cogentle Spat, Goggle
peers only once you send it eight times the usual traffic. Flood Season's terabit floods
count when scrubbing or Flowspec took them. Days cut where a reference won in a tenth of
the time; Stepping Stones and Mid-Atlantic Accent start with 5M; Mid-Atlantic Accent's
description no longer claims Lisbon to Lagos is too long for 1.6T.
Fat Pipes, Router Rodeo, Traffic Cops, N-1 Club and Grand Tour. Every puzzle has
1-star and 3-star references played through the player's actions; budgets sit
over the cheapest 3-star build the solver found, and the tests check that no
single change keeps three stars for less.
Every puzzle now carries demand (eyeballs pulling from a content origin, circuits
with latency caps, best-effort flows) routed by compute(). Stars: delivered,
within budget, N-1 under load. Routers, ports, metrics, standby and the
redundancy check work in puzzles; the whole world is open. Weekly schema 2
carries the demand; scripts/lib/puzzle-solver.js sizes and searches builds.