Every puzzle now carries demand (eyeballs pulling from a content origin, circuits
with latency caps, best-effort flows) routed by compute(). Stars: delivered,
within budget, N-1 under load. Routers, ports, metrics, standby and the
redundancy check work in puzzles; the whole world is open. Weekly schema 2
carries the demand; scripts/lib/puzzle-solver.js sizes and searches builds.
Change Freeze and Sandbox deliver everything in a tenth of the time, but the licence
still took 45 days and the button said so. It now waits leadDays(45), and the button
shows that number.
Frederic's call for 2.0: keep #153's fixes, NOC breakdown, new vectors, gaming risk
and overlapping attacks, but not the per-port model. It split every flood over each
ingress port with traffic (over a thousand on a big network), stored them all in the
save, routed one pinned flow per port, and with it came the build-order and
victim-scoring bugs found in review.
Each attack is again one entry port at the victim (a.entry): upstream clean-pipe,
Flowspec on the victim's router, IX blackholing, a sacrificial PNI and RouteScript
filter it in that order (ddosMitigation), then scrubbing; what leaks is junk at the
victim spread like its traffic, exactly as on main. Saves from 2.0 builds with
a.entries load: sanitize drops the shares and a 'distributed' entry becomes 'edge'.
Removed: R.ingressPorts, ddosEntries/ddosFold/ddosSlices/ddosCities/ddosHasIx, pinned
flows (and the pinned-rank handling in routing and its reference), the mixed-TCAM
line and the 'across N ports' message, and their tests; the scrubbing source-city
test now uses two victims sharing one center. CHANGELOG #153 bullets describe what
ships and credit #153.
Toasts are cleared when a puzzle starts and when you leave it, and every
main-game action (ops, inbox, bank, building, routers and the rest) does
nothing while a puzzle is on; only the puzzle's own actions, menus and
settings work there.
A backup-only link next to a normal one still carried traffic, because
parallel links merge into one edge. The metric stays on the city pair
(S.pairMet), and any link can go on standby: it adds capacity that
fills only after the active links, so it idles as a backup, takes the
overflow when they are full and carries the traffic when they are down.
Build order no longer matters, and adding a link never idles the
others. Old saves keep each pair's lowest metric with every link
active, which is how they routed before. The panel says what a standby
link is doing, the redundancy list tags it, the map draws it dashed
while idle, and traceroute shows the active link.
Hide the countdown when an offer has unmet requirements, missing locations,
expired terms or insufficient service capacity. Keep manual acceptance
available with its existing behavior.
Share capacity previews across the Deals, city and fiber views, reuse them
between automatic checks, and invalidate them after actions or incidents.
Check changing requirements immediately and always perform a fresh full
validation before automatically signing a contract.
Add regression tests for blocked offers, requirements becoming fulfilled
or unfulfilled, capacity changes and preview reuse. All 17 automation tests
pass; the full independent branch passes 314 of 315 tests, with only the
pre-existing locale-dependent subsea formatting failure remaining.