A fiber given up keeps its optics: they go on the spares shelf (#229)

rmLink (a cancelled IRU, your own fiber or a called-off cable) and decommission() dropped links with their channels still plugged in. chBack() puts each optic on the shelf, the same as unplugging it by hand, and a note says how many. One new plural label, in all six languages.
This commit is contained in:
Frederic Jung 2026-10-31 07:15:35 +01:00
parent 59757c2256
commit 2d61c09219
No known key found for this signature in database
11 changed files with 35 additions and 3 deletions

View file

@ -6,6 +6,7 @@ All notable changes to this project are documented here. The project follows
## [Unreleased]
- Cancelling an IRU, giving up your own fiber or decommissioning a POP now puts the optics on its fibers back on the spares shelf, instead of throwing them away (#229).
- Premium submarine terminals and Optical engineering can no longer be bought on a cable where they would change nothing (#198). The button now says so, and an upgrade that only helps together with the other one stays available.
- A wave size that is sold out on a route can no longer be reached by upgrading a smaller wave on it (#201). The upgrade button says how long it is sold out, just like when buying.
- Choosing Both for a PNI with one member now really splits it: the second member arrives in the other building when the augment lands, instead of joining the first (#219).