seriesoftubes/scripts/lib
Frederic Jung 823e4188be
Pay to hurry the permits and factory of your own subsea cable (closes #258)
Before laying starts, seaRush buys 30 days a step (or all of them at once)
at $500k plus $60 a km, with the market's build prices. The floor is the
factory: 60 days plus a day per ~80 km from the order (prepMin, through
leadDays), then the lay ships still need their time at sea, which a second
ship still halves. 6,000 km: from 600 days of prep to 132 for about $13M.
2026-11-03 10:35:16 +00:00
..
compile-labels.js Tests, CHANGELOG and docs for the peering desk 2026-10-29 21:41:28 +01:00
dict.js Translations keyed by labels instead of English text 2026-10-27 11:05:09 +01:00
fuzz-page.js Fit the left tabs on small screens; move routing settings into a modal 2026-11-03 10:20:57 +01:00
mcp-commands.js Pay to hurry the permits and factory of your own subsea cable (closes #258) 2026-11-03 10:35:16 +00:00
mcp-game.js MCP: new_game takes the Best Effort preset (soft); docs and the rules reference say so 2026-11-03 10:22:30 +00:00
mcp-page.js MCP: new_game takes the Best Effort preset (soft); docs and the rules reference say so 2026-11-03 10:22:30 +00:00
page.js Ship short ids instead of labels; checker, tests and docs for labels 2026-10-27 11:27:11 +01:00
puzzle-solver.js Puzzles: real traffic routed by the game, routers, link sizes and paths 2026-10-29 10:35:28 +01:00
route-fuzz.js Differential random games: main's page and this checkout's play the same seeded game move for move 2026-11-01 21:44:30 +01:00
scenario-bot.js Weekly scenario generator with a reference player, and weeks 2026-W44 to W46 2026-10-29 17:34:38 +01:00
scenario-ref.js Tests: Gangnam reference hauls from Tokyo; Seoul-only, Tokyo-only and the old plan fail 2026-10-29 20:59:17 +01:00