A new standing order, Upgrade optical transport. On fiber that is full
and runs above a level, it moves the line system up one size (the
Upgrade click), or trades the smallest lit channels for the biggest
optic that fits, one at a time (setChCount; the old optics go to
spares). With a line system chosen, every fiber below it is moved up,
both steps in one night if need be, cold or not.
A line system swap is a day without the fiber, so only where another
live path joins its cities, no customer rides it, and routing the
network without it serves as much as today (one compute, measured
against today's routing). One fiber is tested and swapped a night,
and a fiber that failed is left alone for a week (not saved), so the
order costs at most one routing more, and only on a night with a
fiber to try.