Keep routers ahead gets a Model setting: the next generation when busy
(as before), or a model to standardize on. With a model, every POP on a
smaller one is swapped to it, the busiest first, within the monthly budget,
through the same upRouter click: never a step down, only unlocked models
that fit, and only where a second router carries the traffic or nothing
runs yet. Busy POPs on it only get more routers.
Every setting in the Standing orders sheet (each order's dials, budgets,
the cash floor) is a dropdown instead of a button that steps through the
values. The change handler passes a select's data-args, the actions take
the picked position (v) and still step without one for the MCP tools,
which now declare v as optional.
- Values pasted into eval'd or inline-script code go through lit() (scripts/lib/js-literal.js), which escapes <, >, /, U+2028 and U+2029 after JSON.stringify
- build test and i18n-check read script tags with a DOM parser or a plain search, not HTML regexes
- mcp.js parses the Authorization header without a backtracking regex
The optics order gets an Optics setting: most Gbps per dollar (the old
behaviour, still the default) or the biggest optic on new fiber, the most
Gbps per channel that fits the budget. It is still an intern: once a fiber
is lit it keeps adding what is in there and never swaps optics or line
systems. X.can() takes a quiet flag so asking about an unaffordable optic
is not logged as the budget running out.