An alien wave rented for about as much as leasing the whole fiber, so a
route sold out to its market earned 11 to 35 times its lease and the
gear paid back in one to three months. A wave now rents for 30% of the
fiber's monthly cost (lease plus amplifiers), and each one sold between
the same two cities goes cheaper, down to 40% of the first: a full
route earns 2 to 6 times its lease. Signed contracts keep their price.
Gameplay rule F6.
Extra crews could bring any land build to the next day. They now cut it
to half its planned time at most, and the button says when it would be
done. Gameplay rule F7.
A typed order (the agent API) could end a wave, dark fiber or cable in a
city the map does not show, and opened a POP there.
The map only drags a link from a POP, but buildLink, orderDf and orderCable
read both ends from UI.pending, which the agent API fills from its
arguments. An agent could sign a dark fiber IRU from a city with no POP
(Aracaju got three of them). The three orders now refuse that with a toast,
and their dry-run quotes report it as blocked.
Three tests ordered from a city with no POP (ACT.start ignores city, so the
only POP was Frankfurt); they now open the POP they assumed.
A subsea cut sends the nearest free ship of its region's maintenance club from its port, along the cable routes at about 500 km a day; the cut lasts while it sails, waits for permits in slow countries and splices (3-5 days shallow, 6-12 deep). Ships stay busy until home (S.fleet). With the club's ships all out the cut waits; a private charter of the quickest free ship costs $1M + $200/km sailed. Own subsea builds show survey/factory, then a lay ship at 150 km/day; a second lay ship can be booked before laying ($3M + $150k/day saved), and crews no longer speed up cables at sea. Ships are drawn on the map and can be tapped.
Speeding up an own subsea cable charters another cable ship ($3M plus $500/km per 30 days saved), and a rush repair on a subsea cut costs $1M plus $200/km. Land crews and trench repairs keep their prices.
Premium submarine terminals and Optical engineering only extend the
long-haul modes of the coherent optics. On many cable lengths (all of
the Atlantic, and about 17,000-18,500 km like Atlanta to Sydney) neither
changes what any optic carries, yet both could be bought.
subHelps() compares every optic's rate with and without the upgrade,
counting an upgrade that only helps together with the other one. The
link panel disables Install with a note, ACT.subUpgrade refuses, and
the cable order screen disables the toggle and only quotes and charges
picks that still help on the chosen design.