Commit graph

13 commits

Author SHA1 Message Date
jvanvik
8068a45abd Plans: the server-run design in the repo, what is left now, and the fork's files
- docs/plans/server-run.md: the server-run design, which lived only outside
  the repo, with a status at the top (T1 and T2 merged, T3, T4 and the
  integration waiting for the go; the four answers; the questions still
  open) and a section on what building T2 changed: a checkpoint needs more
  than route memory (rt carries pt, sl, ord and rk), who a worker exit
  counts against, the budgets now over, the contract additions, the open
  path-window question and what the shared calendar changes. The answers
  are marked where sections 0, 1 and 14 ask; probes are named, not pathed.
- docs/plans/next-session.md: rewritten to match main at 3e30621: what is
  built, the answers, the holds, the nine open questions, what is in
  progress and next, and only the limitations that still hold.
- docs/ARCHITECTURE.md: a table of the fork's own files (build standard,
  dark mode, IPv4, IPv6-only, express fiber, satellites, multiplayer,
  server-run play, the session server and the engine), kept apart from
  upstream's tables so merges stay clean.
- docs/MULTIPLAYER.md: server-run play is being built and not switched on.
2026-11-09 23:01:43 +01:00
jvanvik
e25f843526 Plans: IPv6-only broadband follow-up, and what it left out
Some checks are pending
CI / test 1/4 (push) Waiting to run
CI / test 2/4 (push) Waiting to run
CI / test 3/4 (push) Waiting to run
CI / test 4/4 (push) Waiting to run
CI / build (push) Waiting to run
CI / test (push) Blocked by required conditions
CI / translations (push) Waiting to run
2026-11-07 07:06:37 +01:00
jvanvik
3bc1641a46 Plans: the server runs every multiplayer game, at 1x with a speed vote
Some checks are pending
CI / test 1/4 (push) Waiting to run
CI / test 2/4 (push) Waiting to run
CI / test 3/4 (push) Waiting to run
CI / test 4/4 (push) Waiting to run
CI / build (push) Waiting to run
CI / test (push) Blocked by required conditions
CI / translations (push) Waiting to run
2026-11-07 06:55:24 +01:00
jvanvik
fbae6fc3ed The build standard owns the router model and the line system; one owner per fiber
The routers order reads its model from the build standard (bstd().g, 'keep'
is the old next-model-up rule) and the optical upgrade order its line system
(bstd().sys). The Ops sheet shows "From the build standard: X" with a button
to the sheet. Old saves move a model or line system from an order that was
running into the standard when it has none of its own; a paused order's or
an unhired intern's setting is dropped. opsParam refuses model/sys and points
at bstdSet.

The build standard's order is a generator now: every first job that takes a
fiber dark goes through the optical order's routing test (opsDark, in the
route worker in play), under one shared budget of dark swaps a night (two for
Kevin) and the week-long memory for a failed fiber. A fiber one order worked
on is the other's no more that shift, and decom keeps waves the standard just
upgraded. The plan is checked at every job, since the shift rests between
them: a POP gone or changed by hand meanwhile is skipped. The button still
runs the whole plan at once on the page.
2026-11-07 06:55:01 +01:00
jvanvik
040e25faab Plans: propose a shared session clock for multiplayer
Some checks are pending
CI / test 1/4 (push) Waiting to run
CI / test 2/4 (push) Waiting to run
CI / test 3/4 (push) Waiting to run
CI / test 4/4 (push) Waiting to run
CI / build (push) Waiting to run
CI / test (push) Blocked by required conditions
CI / translations (push) Waiting to run
2026-11-07 05:06:17 +01:00
jvanvik
b533f3baa8 Plans: multiplayer phase 2 design, and what is left after this round
Some checks failed
CI / test 1/4 (push) Waiting to run
CI / test 2/4 (push) Waiting to run
CI / test 3/4 (push) Waiting to run
CI / test 4/4 (push) Waiting to run
CI / build (push) Waiting to run
CI / test (push) Blocked by required conditions
CI / translations (push) Waiting to run
Container image / test (push) Waiting to run
Container image / publish (push) Blocked by required conditions
Auto-release / release (push) Has been cancelled
2026-11-07 01:12:23 +01:00
Frederic Jung
2243280aff
Pie in the Sky: the Founder's antics make markets jumpy, then it wears off
- Every 60 to 120 days while a rocket company exists (the first 90 days after the plan starts), the
  Founder does something daft: a post, a gasp toast and a temporary effect (99-pie-jitters.js).
  A once-a-game antic takes orbit billing down for 3 to 5 days (no orbit income, then a restore post);
  a 3 a.m. spree (orbit offers x0.6 and a 4-point orbit mood dip for 14 days); a fight with a regulator
  (a landing-rights spat via pieSpatStart in a country with a dish or rights, within the spat limit);
  a leaked launch date (insurance 8% -> 14% for 30 days); Mars next year (offers x1.5 for 14 days, a
  promise like the others whose slip cancels the unhappiest 2% of orbit customers).
- Market jitters (S.pie.founder.jit, 0..1): each antic bumps it, it fades by 1/30 a day, and while
  high it lowers orbit offer odds (up to -30%) and holds orbit happiness under 100-25*jit (never low
  enough to cancel at renewal). The Company tab shows one line and a small meter next to the feed.
- Rule O5: harm only with pieChaos(); with chaos off he only posts. Dice only with a company.
- Saves: new founder fields in pieBlank, repaired in pieSanitize (pieAnticFix); old saves load calm.
- Insurance button shows the current premium (pie.ins_on_p replaces pie.ins_on). Agent docs updated.
- pie-balance: compute() also reruns when orbit billing goes down or comes back.
- tests/pie-founder.test.js: each antic, decay, once-only billing outage, chaos off, saves, 360 px.
2026-11-06 09:58:00 +01:00
Frederic Jung
9d74873edb
NOC tab and Pie Control tidied for phones: Pie Control in the NOC top row, traceroute in Routing & DDoS, government money in the bank
- NOC tab: Pie Control is a button in the top row next to "Open NOC dashboard" (only once the rocket
  company is unlocked) and replaces the Pie in the Sky card; a spat waiting for an answer keeps its card.
  The Connections button is gone (it lives in the NOC dashboard), and the traceroute moved into the
  Routing & DDoS modal as an entry that opens the unchanged traceroute modal.
- Government money (Rural Digital Pie Fund, Pitcairn grant, Ex-Im Pie Bank) is a section of the bank,
  shown with a rocket company or anything of the fund's to show. pieGovOpen, the action the toasts use,
  opens the bank there; pieTab({t:'gov'}) does too.
- Pie Control has four tabs (Traffic, Company, Launch, Dishes) in one segmented control that fits 360 px,
  styled like the HUD's speed buttons. The Founder's posts and the orbit books moved into the Company tab,
  newest three posts shown and the rest folded. A stale UI.pieTab of 'gov', 'book' or 'founder' falls back.
- Agent docs for pieGovOpen, pieTab, routingOpen and connOpen; the route fuzzer drops connOpen from the
  NOC tab on both pages to stay in lockstep with main.
- Tests: tests/noc-panel-layout.test.js, and the pie tests follow the moves.
2026-11-06 09:58:00 +01:00
Frederic Jung
8b92adcaa8
Pie in the Sky: government money for rocket companies
A Gov tab in Pie Control with three state programmes:

- Rural Digital Pie Fund: reverse auctions for towns only orbit reaches
  (a cut-off POP on backhaul, or a small town of your terminals). Ask
  90%, 70% or 50% of the reserve against a rival; the lower ask is paid
  monthly for five years while the town stays 70% served (monthly
  average) from a 90-day deadline. One bad month warns, two revoke the
  award and claw back half of the last year's support.
- Ex-Im Pie Bank: a BANKS loan of half the value of the pies flying and
  booked (at most 20% of a full Shortcrust, counted by O7), 1.5-2.5%
  over 60 months, never offered by the usual banks. Space covenants:
  launch n pies in a year, keep a pie dish in the lending country. A
  breach brings the bank's penalty, +3 points, a new launch deadline
  and, with chaos on, a "data stays home" or landing-rights spat there.
- Pitcairn: served from orbit (backhaul or home terminals) at 90% of its
  demand, latency forgiven, the UK pays a $120k/mo satellite grant.

Subsidies count in the orbit's books. tests/pie-gov.test.js covers the
features; pie-balance.test.js gains a run with government money, which
must pay back sooner by at most two years.
2026-11-06 09:57:51 +01:00
Frederic Jung
1de0723c35
Pie in the Sky: a full constellation pays back in about seven years
Rule O7's payback half is now played through the game loop
(tests/pie-balance.test.js): the big-network save runs a full lasered
Shortcrust by a sensible policy until its books balance, in 5 to 10 years
(6.3 on seed 7; 7.4 and 6.9 on seeds 11 and 3). The static formula is gone.

Retune: pies $0.5M (+$0.25M lasers), from $1M (+$0.5M); landing rights
$12,000 per eyeball up to $100M a year, from $28,000 up to $200M; orbit
rates x1.25 (pizza 25k, flywifi 36k, boat 27.5k, marsorb 44k); PIE_SELL
0.25 -> 0.4; PIE_OFFER_RATE 1/6 -> 1/3.
2026-11-06 09:57:51 +01:00
Frederic Jung
d7d5d21372
Pie in the Sky: dips in orbit hurt instead of emptying the sky
A crust carries a share of its traffic from 40% coverage, growing to all
of it at 60% (pieCarry/pieCap), instead of nothing until 60%. Pies wear out
over the last 30% of their life (pieAlive), deterministic, so a launch month
no longer deorbits on one day. Storms take 2-10% and food fights 5-10% of a
crust (PIE_HIT), down from up to 40% and 20%. Orbit customers lose at most
PIE_PATIENCE happiness a day without service, about a month to cancel.
2026-11-06 09:57:51 +01:00
Frederic Jung
940ce0df10
Pie in the Sky: backhaul for POPs cut off from the backbone
A pie dish at a POP the backbone does not reach now lifts all of that
POP's own traffic to a landing dish on the backbone (bent pipe within
1,000 km, lasers past that): one virtual edge, capacity min(dish, landing
dish, crust) after terminals, latency the orbit path. Its IGP weight is
Infinity; only the cut-off POP's paths are rerun with it (pieRelink), so
POPs on the backbone never route through orbit and saves without a
cut-off dish route exactly as before. Spats, safe mode, a down crust,
landing rights and backhoes cut it.

A cut-off dish now reports 'backhaul' or 'isl' (it said 'ok' when it
had local terminals). Rule O3 now reads: a cut-off pie dish carries only
its own POP's traffic and local terminals, never transit between other
cities.
2026-11-06 09:57:40 +01:00
Frederic Jung
d2c7294ed3
Plan: Pie in the Sky constellation spec 2026-11-06 09:57:23 +01:00