286ae48207 Build standard: never take a fiber dark under a customer's wave; the intern no longer skips leased pairs and IRUs
The build standard's Apply could swap the line system on a fiber that carries a
sold alien wave or a Lambda Bazaar managed wave, taking those customers dark for
a day with no warning. The intern refused any fiber with any customer on it,
leased pairs and IRUs included, though a line-system swap cannot touch them.

One helper next to fiberOk(), dfWaveCust(), says whether a customer rides the
fiber's line system (every fiber type but glass: dfpair, pairs, capfib), and both
bstdDarkOk() and opsDarkPre() use it. bstdPlan() holds such a fiber (J.held) and
lists it in J.wv; the sheet and the MCP quote give that reason. The link
panel's own upgrade button (ACT.upSys) still swaps with a warning toast.
2026-11-09 23:02:02 +01:00
jvanvik
fbae6fc3ed The build standard owns the router model and the line system; one owner per fiber
The routers order reads its model from the build standard (bstd().g, 'keep'
is the old next-model-up rule) and the optical upgrade order its line system
(bstd().sys). The Ops sheet shows "From the build standard: X" with a button
to the sheet. Old saves move a model or line system from an order that was
running into the standard when it has none of its own; a paused order's or
an unhired intern's setting is dropped. opsParam refuses model/sys and points
at bstdSet.

The build standard's order is a generator now: every first job that takes a
fiber dark goes through the optical order's routing test (opsDark, in the
route worker in play), under one shared budget of dark swaps a night (two for
Kevin) and the week-long memory for a failed fiber. A fiber one order worked
on is the other's no more that shift, and decom keeps waves the standard just
upgraded. The plan is checked at every job, since the shift rests between
them: a POP gone or changed by hand meanwhile is skipped. The button still
runs the whole plan at once on the page.
2026-11-07 06:55:01 +01:00
Frederic Jung
ed0cac9974
Interns: the same orders, each best at one part of the job
The three interns run every order the same way at the same salary;
each is now better at one thing, and says so when hired:
- Anycast Annie peers: the IX order runs every day, not only weekly, and
  the PNI order twice a week.
- Kevin from the night shift does maintenance: two line system swaps a
  night instead of one, and never a fat finger. He rolls the same dice
  (catching it before Enter), so a seeded game plays the same whoever is
  hired.
- Tracy Route plans ahead: the transit, ports, routers, optics and
  optical transport orders act as if traffic were already 10% higher
  (OPS_AHEAD).
2026-11-06 20:23:25 +00:00
Frederic Jung
647e302f1c
The intern upgrades optical transport
A new standing order, Upgrade optical transport. On fiber that is full
and runs above a level, it moves the line system up one size (the
Upgrade click), or trades the smallest lit channels for the biggest
optic that fits, one at a time (setChCount; the old optics go to
spares). With a line system chosen, every fiber below it is moved up,
both steps in one night if need be, cold or not.

A line system swap is a day without the fiber, so only where another
live path joins its cities, no customer rides it, and routing the
network without it serves as much as today (one compute, measured
against today's routing). One fiber is tested and swapped a night,
and a fiber that failed is left alone for a week (not saved), so the
order costs at most one routing more, and only on a night with a
fiber to try.
2026-11-06 18:26:24 +00:00