A subsea cut sends the nearest free ship of its region's maintenance club from its port, along the cable routes at about 500 km a day; the cut lasts while it sails, waits for permits in slow countries and splices (3-5 days shallow, 6-12 deep). Ships stay busy until home (S.fleet). With the club's ships all out the cut waits; a private charter of the quickest free ship costs $1M + $200/km sailed. Own subsea builds show survey/factory, then a lay ship at 150 km/day; a second lay ship can be booked before laying ($3M + $150k/day saved), and crews no longer speed up cables at sea. Ships are drawn on the map and can be tapped.
Speeding up an own subsea cable charters another cable ship ($3M plus $500/km per 30 days saved), and a rush repair on a subsea cut costs $1M plus $200/km. Land crews and trench repairs keep their prices.
Premium submarine terminals and Optical engineering only extend the
long-haul modes of the coherent optics. On many cable lengths (all of
the Atlantic, and about 17,000-18,500 km like Atlanta to Sydney) neither
changes what any optic carries, yet both could be bought.
subHelps() compares every optic's rate with and without the upgrade,
counting an upgrade that only helps together with the other one. The
link panel disables Install with a note, ACT.subUpgrade refuses, and
the cable order screen disables the toggle and only quotes and charges
picks that still help on the chosen design.