Commit graph

2 commits

Author SHA1 Message Date
jvanvik
fbae6fc3ed The build standard owns the router model and the line system; one owner per fiber
The routers order reads its model from the build standard (bstd().g, 'keep'
is the old next-model-up rule) and the optical upgrade order its line system
(bstd().sys). The Ops sheet shows "From the build standard: X" with a button
to the sheet. Old saves move a model or line system from an order that was
running into the standard when it has none of its own; a paused order's or
an unhired intern's setting is dropped. opsParam refuses model/sys and points
at bstdSet.

The build standard's order is a generator now: every first job that takes a
fiber dark goes through the optical order's routing test (opsDark, in the
route worker in play), under one shared budget of dark swaps a night (two for
Kevin) and the week-long memory for a failed fiber. A fiber one order worked
on is the other's no more that shift, and decom keeps waves the standard just
upgraded. The plan is checked at every job, since the shift rests between
them: a POP gone or changed by hand meanwhile is skipped. The button still
runs the whole plan at once on the page.
2026-11-07 06:55:01 +01:00
Frederic Jung
1e7638c4b9
The intern standardizes routers on a chosen model; Ops settings are lists
Some checks are pending
CI / test 1/4 (push) Waiting to run
CI / test 2/4 (push) Waiting to run
CI / test 3/4 (push) Waiting to run
CI / test 4/4 (push) Waiting to run
CI / build (push) Waiting to run
CI / test (push) Blocked by required conditions
CI / translations (push) Waiting to run
Keep routers ahead gets a Model setting: the next generation when busy
(as before), or a model to standardize on. With a model, every POP on a
smaller one is swapped to it, the busiest first, within the monthly budget,
through the same upRouter click: never a step down, only unlocked models
that fit, and only where a second router carries the traffic or nothing
runs yet. Busy POPs on it only get more routers.

Every setting in the Standing orders sheet (each order's dials, budgets,
the cash floor) is a dropdown instead of a button that steps through the
values. The change handler passes a select's data-args, the actions take
the picked position (v) and still step without one for the MCP tools,
which now declare v as optional.
2026-11-06 17:19:17 +00:00