Conflicts with main resolved: the intern's chosen router model, optical upgrades and personas are generators like the
other orders, with a rest after each job. The optical upgrade's fiber test is a step the day answers, in the route
worker in play (opsDark(), {dark}), like the sales desk's trial; the renewal desk's reroute is a step too (slRenRun()).
The three interns run every order the same way at the same salary;
each is now better at one thing, and says so when hired:
- Anycast Annie peers: the IX order runs every day, not only weekly, and
the PNI order twice a week.
- Kevin from the night shift does maintenance: two line system swaps a
night instead of one, and never a fat finger. He rolls the same dice
(catching it before Enter), so a seeded game plays the same whoever is
hired.
- Tracy Route plans ahead: the transit, ports, routers, optics and
optical transport orders act as if traffic were already 10% higher
(OPS_AHEAD).
A new standing order, Upgrade optical transport. On fiber that is full
and runs above a level, it moves the line system up one size (the
Upgrade click), or trades the smallest lit channels for the biggest
optic that fits, one at a time (setChCount; the old optics go to
spares). With a line system chosen, every fiber below it is moved up,
both steps in one night if need be, cold or not.
A line system swap is a day without the fiber, so only where another
live path joins its cities, no customer rides it, and routing the
network without it serves as much as today (one compute, measured
against today's routing). One fiber is tested and swapped a night,
and a fiber that failed is left alone for a week (not saved), so the
order costs at most one routing more, and only on a night with a
fiber to try.
Keep routers ahead gets a Model setting: the next generation when busy
(as before), or a model to standardize on. With a model, every POP on a
smaller one is swapped to it, the busiest first, within the monthly budget,
through the same upRouter click: never a step down, only unlocked models
that fit, and only where a second router carries the traffic or nothing
runs yet. Busy POPs on it only get more routers.
Every setting in the Standing orders sheet (each order's dials, budgets,
the cash floor) is a dropdown instead of a button that steps through the
values. The change handler passes a select's data-args, the actions take
the picked position (v) and still step without one for the MCP tools,
which now declare v as optional.
While a step of the day waits for the route worker, the player can act. Three steps then resumed on what they had
noted before:
- a sales trial overtaken by an action ran again with the happy customers as indices into S.biz: a customer dropped
meanwhile made one point past the end and the day stopped on an exception. dayAgain() makes the trial's checks,
the customer and who is happy again on the game as it is; an offer signed or declined by hand meanwhile is not
the desk's;
- the intern's PNI round placed the batch's quotes as they were: a PNI ordered by hand while it waited was ordered
a second time. pniRequote() quotes each order again just before it is placed;
- a failure and the monkey's snip took the last incident after their routing: repaired meanwhile, it was gone or
another one. They keep their own incident before the routing, and offer a repair only while it stands.
The day split of #312 on its own, from 3.0.0, without its routing core, save or map changes. On a big network at
x8 the game stopped whenever a day rerouted: after a failure, an event, the NOC intern's shift or the sales desk's
signing, dayPost() routed on the page.
* The day is a generator (dayRun(), dayPreRun(), dayPost()): each yield is a compute() it needs. dayTick() answers
them on the spot (tests, fallback); in play rwGo() posts each one to the route worker. A failure (failureRun()), a
DDoS and Auto-RTBH (ddosNewsRun()), the chaos monkey's snip (mkSnipRun()), an event's cut (eventRun()), the
intern's shift (opsRun()) and the sales desk (slAutoRun(), its trials answered by the worker with offerTrial())
are steps of the day. fireFailure(), opsDay() and slAutoDay() still play them in one go.
* yield DAY_REST lets a long day draw a frame between two steps (half a frame, 3 to 8 ms, RW.budget). One day in
flight at a time, resting or routing: the clock waits for the day, and a half day is never saved.
* UI.tick is set around every step (dayStep()), so quiet notifications hold in play, not only in dayTick().
* The daily mood check works out the land islands once per pass over the customers (TERR), instead of walking
every land link for each customer afraid of sharks. This fix is thesysadmindev's, from #310; here the islands are
worked out again if something routed meanwhile (RW.gen), since the mood loop can now rest between customers.
Same game either way: tests/day-steps.test.js plays a second page as the worker and compares each day with
dayTick(), the intern on every order, failures, events, DDoS and the monkey forced.
Thanks to thesysadmindev for the profiling in #310 that pointed at the reroutes, and for the sharks fix.
The NOC intern loses the sales order. Saves that had it load cleanly: sanitize drops the order, its log lines and its
weekly tally, and an intern who was running it hands its switch and minimum to the sales desk (S.slAuto).
With someone at the sales desk, the player can let them sign offers once a game day and decline the ones under a
minimum (39-sales-auto.js), each in their own style: the engineer and the CEO sign after the #185 routing trial (one a
day, a misfit waits a week), the shark signs every offer whose POPs are up, promises and commission included, and the
CEO's declines are a handshake away. Orbit offers need room on their landing dish instead of a trial. Nobody at the
desk (the default; the CEO is a choice, not a given): every deal is signed by hand. The sales desk runs before the
intern's shift, so a deal signed today is in the loads the intern works from. The sheet shows the switch, the minimum
and this week's and last week's tally; the NOC gets one notice a week.
Orbit offers go through the desk too (99-pie-sales.js): they carry o.by, so commission, renewal haggles and each
one's mark at renewal apply. The engineer only offers where the landing dish has 1.5x room on a well-served POP, and
those customers renew like the nerds (0.5x leave). The shark rings airlines, cruise lines and the Mars mission first,
at the biggest size that fits and 25% more, and half of them get a full-sky promise (REQS.skyfull: a crust at 90%)
before there is one; they grumble down to 40 happiness and never cancel over the promise alone. The CEO plays every
other golf game with the Founder: the biggest orbit deal that fits, Mars first, at 30% off; jitters cut his orbit
prices by 0.4x the jitters and from 0.6 the Founder skips golf. Without a salesperson orbit offers are drawn exactly
as before (the O7 balance save has nobody at the desk: payback unchanged, 7.0 years on seed 7, 7.5 on seed 11).
Also: the scenario reference plays 'sales' as the CEO signing for you; the route fuzz leaves out the state and
buttons of a standing order only main still has; the intern's on/off dials (paid peering, keep a spare) show their
translated value in the shipped page instead of the raw label.
A new Normal game now asks what it is building before anything else, in
a popup that holds the clock and cannot be closed without an answer;
the tutorial waits for it. A save still in its first month that never
picked is asked on load. Sandbox, puzzles and scenarios never ask.
The Cable broker builds and lights glass from day one at the prices
everyone pays at the top level: dark fiber, every line system and optic,
digging without the pioneer markup, own subsea cables and their
upgrades, eight pairs, and every router those optics need. Everything
else unlocks by level as before. Its offers lean to carriers buying
waves and pairs, capacity conferences are open to it at any level, and
carriers call about three times a year with a capacity deal. It runs its
own ten-goal ladder and wins Glass Baron (own cables on five continents,
$1M a month of capacity sales), with a badge; Tier 1 stays its own win.
Classic and boutique networks may lay their own subsea cable from
customer level 9 as well as after Tier 1.
Rule M6 (gameplay-rules): a charter changes what you set out to do,
never what things cost. Closes#300.
- IX ports are measured at their nominal capacity: a LACP fault or one
building down no longer buys a bigger port for a day or two.
- The order stops before working anything out when its budget is spent
(31 ms a day to 0.05 ms on the big network at 3x), and a port that takes
a LAG no longer prices every upgrade first.
- The log names the exchange, not its city.
- Tests for the LACP case and a remote IX port; a test comment's numbers;
a shorter CHANGELOG bullet that no longer promises a per-POP switch for
remote ports.
A new standing order, Keep peering headroom, works like the transit one: it
keeps each PNI and IX port above a multiple of today's traffic (1.25x to 3x).
A single port at a POP with several routers gets a second port in a LAG; any
other port moves up to the smallest port size that fits, or the biggest the
router takes. If the preferred move cannot be done it tries the other one.
It pays through the same actions as a click (ACT.pni, ACT.lagP, ACT.buyIx,
ACT.lagIx), is off by default, has the Headroom and Budget dials and the
per-POP switch, and keeps to the cash floor. A PNI augment on order is waited
for, router ports an augment will take are not promised twice, and nothing
is bought while a DDoS flood is live, since the flood counts as port usage.
The intern's monthly bill figure (opsMoNow) now counts IX ports too.
The optics order gets an Optics setting: most Gbps per dollar (the old
behaviour, still the default) or the biggest optic on new fiber, the most
Gbps per channel that fits the budget. It is still an intern: once a fiber
is lit it keeps adding what is in there and never swaps optics or line
systems. X.can() takes a quiet flag so asking about an unaffordable optic
is not logged as the budget running out.
The Build POP button quoted only the site, though popStdApply then paid
for the standard routers on top. popStdQuote() prices the standard the
way it is paid; the button, a note under it and the intern's one-tap
template now include it, and the toast says what the routers cost.
With Cheapest the intern signs whoever is cheapest (often Cogentle), and a named provider only ever grows that one port, so a second upstream never grew. Already connected only grows the transit you already buy at each POP, the smallest port first (ties: the cheaper), and never signs a new provider. The default stays Cheapest, so saves behave as before. One new label in all six languages.
The threshold compared the city's whole eyeball demand times the network's traffic share, so a network whose cache boxes in that POP serve most of it (NetChill) looked far bigger than the PNI list said. It now uses pniVal(net,city).want: what your users there send over transit, an exchange or a PNI elsewhere, from live routing.
opsWhere checked isCity() first, and a city's first exchange has the city's id (lon is LYNX), so 'Apfelwein-IX, London' meant Apfelwein-IX and LYNX. Peering entries are always exchanges: opsLine and opsWeekLine now pass the kind and name them with ixName(). Saved reports read right without migration.
Its NOC notification pointed at the NOC tab, where the notification already
is, so Open did nothing. It now opens the Ops sheet, which holds the report.