After #115: upgrading an existing PNI, in the Peering tab and in the NOC's
connection list, also showed only the one-off cost. Both now read
'Upgrade 100G $2.3k + $350/mo', like transit. The two old labels without a
monthly part are no longer used and leave it.js and pt.js.
Networks follow PeeringDB's 14 Düsseldorf facilities: NTT, Tell-Ya,
Cogentle, Drizzle, Voda-Phony, Doitsche Telekomm and the Crowdflare,
Amazin', Microsnoft and BiteDance clouds (NetChill and Akamaybe are
everywhere already). No nudge needed: 27+ map units from Frankfurt,
Amsterdam and Brussels.
The #16 shark test compared .land, which ignores Cairo's land2, so a
valid overland Mumbai-Cairo ask counted as crossing an ocean once the
extra city shifted the seeded draws. It now uses isSub like the game.
Honolulu, Guam, Koror, Majuro, Port Moresby, Honiara, Noumea, Suva,
Nuku'alofa, Apia, Pago Pago and Papeete, each its own landmass with its
real outline on the map. Exchanges only where one runs today (DRF IX,
Guam IX, Fiji-IXP, CAN'L IXP, Solomon Islands IX); PNG and Tonga have
none active, Samoa's is still planned.
Cables follow real landings: new pairs on Southern Cross, Hawaiki, AJC,
JGA, Bifrost and Humboldt (existing pairs untouched, so saves keep their
links), plus SEA-US, AAG, Echo, HANTRU-1, Coral Sea, Gondwana-1, Tonga
Cable, Tui-Samoa, ASH, Honotua, Manatua and SX NEXT as puns.
Subsea waves have no regens, so a POP on an island splits a crossing into
shorter spans: California-Sydney 400G -> 1.6T per wave via Honolulu and
Suva, LA-Hong Kong/Manila 400G -> 800G via Guam, Santiago-Sydney
400G -> 800G via Tahiti (1.2T on own fiber). LA-Tokyo stays 800G leased:
Honolulu-Guam is just over the 6,000 km 1.6T reach.
Twelve island networks, all with Tier 1 upstreams so Tier 1 players keep
their reach. PacNOG in Suva, unreliable power in Guam, Port Moresby and
Honiara, volcano cuts for Tonga, and the Stepping Stones scenario
(1.6T hop by hop from Los Angeles to Sydney).
- #88: own subsea cables longer than the best subsea optic reach are refused
with a reason; cancelling one mid-build refunds 75% of the unlaid part, and
an unusable one from an old save is refunded in full.
- #36: your own IX picks building A, B or both (second switch, +50% fabric
fee) instead of showing site and LAG buttons that did nothing.
- #105: no maintenance window or incident when swapping the only router in a
POP nothing depends on yet.
- #104: declining a loan redraws the top bar and saves.
- #50: a city with no cable landing names the nearest landing station.
A chat card in the menu and How to play, a footer link on the title screen
(Italian and Portuguese included), plus README, CONTRIBUTING and a contact
link in the issue chooser.
Suggest protect customers only where IP customers would get unhappy
(under 95% served): it costs a second routing pass, about +65% on a big
network. Point at the exchange the network actually peers at, where you
have no port yet, instead of the city's main IX. And the draft admits it
has never been paged at 3 a.m.
Ported onto #89's routing loop: the prepend share is its own transit exit,
local-pref and prepending get their own ranks, and protect customers runs
business flows through every rank before home users. Portuguese for the
five new strings.
Adds site/i18n/pt.js with all 2429 strings, registers Português in the
language list (picked automatically for pt-* browsers), caches it in the
service worker, and runs the full screen tour in Portuguese in the tests.