- docs/plans/server-run.md: the server-run design, which lived only outside
the repo, with a status at the top (T1 and T2 merged, T3, T4 and the
integration waiting for the go; the four answers; the questions still
open) and a section on what building T2 changed: a checkpoint needs more
than route memory (rt carries pt, sl, ord and rk), who a worker exit
counts against, the budgets now over, the contract additions, the open
path-window question and what the shared calendar changes. The answers
are marked where sections 0, 1 and 14 ask; probes are named, not pathed.
- docs/plans/next-session.md: rewritten to match main at 3e30621: what is
built, the answers, the holds, the nine open questions, what is in
progress and next, and only the limitations that still hold.
- docs/ARCHITECTURE.md: a table of the fork's own files (build standard,
dark mode, IPv4, IPv6-only, express fiber, satellites, multiplayer,
server-run play, the session server and the engine), kept apart from
upstream's tables so merges stay clean.
- docs/MULTIPLAYER.md: server-run play is being built and not switched on.
The routers order reads its model from the build standard (bstd().g, 'keep'
is the old next-model-up rule) and the optical upgrade order its line system
(bstd().sys). The Ops sheet shows "From the build standard: X" with a button
to the sheet. Old saves move a model or line system from an order that was
running into the standard when it has none of its own; a paused order's or
an unhired intern's setting is dropped. opsParam refuses model/sys and points
at bstdSet.
The build standard's order is a generator now: every first job that takes a
fiber dark goes through the optical order's routing test (opsDark, in the
route worker in play), under one shared budget of dark swaps a night (two for
Kevin) and the week-long memory for a failed fiber. A fiber one order worked
on is the other's no more that shift, and decom keeps waves the standard just
upgraded. The plan is checked at every job, since the shift rests between
them: a POP gone or changed by hand meanwhile is skipped. The button still
runs the whole plan at once on the page.