Hold the lay ship through a construction delay instead of restarting the lay (#322)
A delay that hit your own subsea cable while it was being laid moved the
whole laying stretch later: the ship vanished, the laid km went back to
zero and the survey and factory could be hurried and paid for again. The
delay now holds the ship where it is (l.lay: start, share laid, resume
day), so laying picks up after the delay. Old saves without the field lay
as before; sanitize() repairs or drops it.
2026-11-08 17:57:27 +00:00
Frederic Jung
823e4188be
Pay to hurry the permits and factory of your own subsea cable (closes #258)
Before laying starts, seaRush buys 30 days a step (or all of them at once)
at $500k plus $60 a km, with the market's build prices. The floor is the
factory: 60 days plus a day per ~80 km from the order (prepMin, through
leadDays), then the lay ships still need their time at sea, which a second
ship still halves. 6,000 km: from 600 days of prep to 132 for about $13M.
2026-11-03 10:35:16 +00:00
Frederic Jung
66aaaec5f1
A waiting subsea cut offers a charter only when it beats waiting for the club's first ship home 2026-11-01 11:52:42 +00:00
Frederic Jung
96e2c2f537
Cable ships: club repair ships sail out to subsea cuts, private charters jump the queue, lay ships build your cables
A subsea cut sends the nearest free ship of its region's maintenance club from its port, along the cable routes at about 500 km a day; the cut lasts while it sails, waits for permits in slow countries and splices (3-5 days shallow, 6-12 deep). Ships stay busy until home (S.fleet). With the club's ships all out the cut waits; a private charter of the quickest free ship costs $1M + $200/km sailed. Own subsea builds show survey/factory, then a lay ship at 150 km/day; a second lay ship can be booked before laying ($3M + $150k/day saved), and crews no longer speed up cables at sea. Ships are drawn on the map and can be tapped.
2026-11-01 11:24:53 +00:00