The build standard owns the router model and the line system; one owner per fiber

The routers order reads its model from the build standard (bstd().g, 'keep'
is the old next-model-up rule) and the optical upgrade order its line system
(bstd().sys). The Ops sheet shows "From the build standard: X" with a button
to the sheet. Old saves move a model or line system from an order that was
running into the standard when it has none of its own; a paused order's or
an unhired intern's setting is dropped. opsParam refuses model/sys and points
at bstdSet.

The build standard's order is a generator now: every first job that takes a
fiber dark goes through the optical order's routing test (opsDark, in the
route worker in play), under one shared budget of dark swaps a night (two for
Kevin) and the week-long memory for a failed fiber. A fiber one order worked
on is the other's no more that shift, and decom keeps waves the standard just
upgraded. The plan is checked at every job, since the shift rests between
them: a POP gone or changed by hand meanwhile is skipped. The button still
runs the whole plan at once on the page.
This commit is contained in:
jvanvik 2026-11-07 06:55:01 +01:00
parent 032470f486
commit fbae6fc3ed
22 changed files with 573 additions and 138 deletions

View file

@ -6,6 +6,8 @@ All notable changes to this project are documented here. The project follows
## [Unreleased]
- The router model and the line system your intern standardizes on are now picked in one place, the build standard. Keep routers ahead and Upgrade optical transport take them from there and say so, with a button to the sheet. With a model or line system in the standard, both orders bring everything up to it and stop there (Upgrade optical transport on every fiber, even at POPs that Keep to the build standard skips); "Keep as is" leaves them to the next one up when busy. A model or line system you had picked in an order that was running moves into your standard, so new POPs get that model too.
- Your intern no longer takes a fiber dark for the build standard just because it looks quiet: like the optical upgrade order, it first checks that every gigabit, circuit and express gets around the fiber for the day. The two orders share one line system swap a night (two for Kevin), never work on the same fiber in one shift, and a wave the standard just upgraded is no longer handed back the same day.
- Whoever runs sales can now answer renewal haggles for you, each in their own way: switch it on at the sales desk. The engineer keeps nerdy customers at the market price and gives everyone else their discount, the shark refuses discounts and some customers walk, and the CEO settles it on the golf course, for better or worse.
- The three interns now each have something they are best at: Anycast Annie peers every day and orders PNIs twice a week, Kevin from the night shift swaps two line systems a night and never fat-fingers anything, and Tracy Route buys capacity as if traffic were already 10% higher. They run the same orders at the same salary.
- Your intern can upgrade optical transport: a new standing order moves full, busy fiber to a bigger line system, or trades its smallest channels for bigger optics. Pick a line system, and every fiber on a smaller one is moved up to it. A line system swap takes the fiber down for a day, so the intern only does it where the traffic gets around it and no customer rides it, one a night.