Submarine upgrades that change nothing on a cable can't be bought (#198)
Premium submarine terminals and Optical engineering only extend the long-haul modes of the coherent optics. On many cable lengths (all of the Atlantic, and about 17,000-18,500 km like Atlanta to Sydney) neither changes what any optic carries, yet both could be bought. subHelps() compares every optic's rate with and without the upgrade, counting an upgrade that only helps together with the other one. The link panel disables Install with a note, ACT.subUpgrade refuses, and the cable order screen disables the toggle and only quotes and charges picks that still help on the chosen design.
This commit is contained in:
parent
48e6200c53
commit
f4c8400df1
14 changed files with 127 additions and 20 deletions
|
|
@ -6,6 +6,8 @@ All notable changes to this project are documented here. The project follows
|
|||
|
||||
## [Unreleased]
|
||||
|
||||
- Premium submarine terminals and Optical engineering can no longer be bought on a cable where they would change nothing (#198). The button now says so, and an upgrade that only helps together with the other one stays available.
|
||||
|
||||
## [1.37.0] — 2026-10-28
|
||||
|
||||
- Series of Tubes now speaks German. The game follows your browser's language the first time, and you can switch to German under Settings or on the title screen. Networking terms like Peering and Transit stay in English, the way network engineers say them.
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue