Merge branch 'claude/latency-contracts' into trial
# Conflicts: # .claude/skills/gameplay-rules/SKILL.md # CHANGELOG.md # tests/day-steps.test.js # tests/route-fuzz.test.js
This commit is contained in:
commit
e8cbb9b440
45 changed files with 1147 additions and 47 deletions
|
|
@ -10,7 +10,16 @@ All notable changes to this project are documented here. The project follows
|
|||
- Your traffic to home internet providers now starts where their customers live: a New York POP talks a lot to Comecast and little to Doitsche Telekomm, Frankfurt the other way round. Peering with a big eyeball network in the cities its users are in now takes that traffic off your backbone, while peering in only two cities means hauling it there from everywhere else (#48).
|
||||
- Giant AI circuits now come from campuses in more than 30 metros, from Oregon and Wyoming to Atlanta, Querétaro and Québec, and less often from cities already crowded with them. Ashburn stays a little busier than the rest, but no longer has to carry the whole late game with four other cities (#61).
|
||||
- RouteScript can spill early onto detours within a latency budget: `spill at 80% within 10 ms` keeps a hot link at 80% and moves the rest onto the fastest detour that adds at most 10 ms and is itself under 80%. Stack them (`spill at 90% within 20 ms`) to spill further as links get hotter (#136).
|
||||
- From customer level 7, low-latency wholesale routes call: 1.6 or 3.2 Tbps between two of your cities with a strict latency limit, paying about three times what a hyperscaler pays per Gbps on the same route. Every day over the limit (after the first 15) you pay back a day's fee as an SLA credit and they lose patience twice as fast as a trading link over its limit, so keep a fast path and a fast backup. They never grow past 3.2 Tbps, so one contract cannot carry a whole level (#137).
|
||||
- From customer level 2, you can save up to three POP standards (micro POP, medium POP, regional hub), each a router model and a number of routers, and mark which POP is which. One button in a POP's Infra tab brings it up to its standard, and Utilities brings every POP of a kind up at once with the price shown first. A POP is never stepped down to a smaller model, and a busy POP with one router gets its second router before the swap, so the upgrade rolls instead of taking the POP down (#315).
|
||||
- Utilities can now install the redundancy kit at every POP still missing part of it in one go, at one price shown on the button, from customer level 2. With a NOC intern you can also put the kit in the intern's new-POP template from there (#317).
|
||||
- A customer asking for a backup generator, a second router or a second site at POPs you already have now shows what is missing and what it costs, with a button that buys exactly that and signs the deal. Nothing is bought unless you press it (#241).
|
||||
- The NOC intern's "Light more fiber" order can now leave new fiber dark, so a fiber handed over in the night no longer pulls in traffic before you are ready for it. Fiber you light yourself still gets more optics when it runs hot (#316).
|
||||
- The Transit and Peering tabs of a POP have a search box for a network's name or AS number and a "Connected only" switch, so you can find the one network you need in a long list, on phones too (#199).
|
||||
- Decommissioning one of several links between the same two cities keeps the link panel open on the next one, so you can hand back a row of waves without reopening it each time (#119).
|
||||
- A link that a closed border has taken down, like Doha to Dubai or Abu Dhabi while the neighbours have fallen out, now says so in its panel, with the days until it comes back, instead of showing nothing wrong. Leasing a new wave or fiber pair across that border during the spat warns you first that it will stay dark (#329).
|
||||
- A customer asking for a discount at renewal now shows how much traffic they book and get, the price per Gbps now and asked, and any latency limit or path terms they signed for, each ticked or crossed as your network stands today (#292).
|
||||
- The two city names at the top of a wave, dark fiber or virtual circuit panel now open that city, for example to upgrade the router there before a bigger link (#196).
|
||||
|
||||
## [3.3.0] — 2026-11-09
|
||||
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue