Hold the lay ship through a construction delay instead of restarting the lay (#322)
A delay that hit your own subsea cable while it was being laid moved the whole laying stretch later: the ship vanished, the laid km went back to zero and the survey and factory could be hurried and paid for again. The delay now holds the ship where it is (l.lay: start, share laid, resume day), so laying picks up after the delay. Old saves without the field lay as before; sanitize() repairs or drops it.
This commit is contained in:
parent
4292cd4c74
commit
d971ded259
6 changed files with 88 additions and 5 deletions
|
|
@ -15,7 +15,7 @@ const subUpgradeReady=(l,k)=>l.kind==='df'&&l.sub&&l.own&&Number.isFinite(l['sub
|
|||
const subUpgradeCost=(l,k)=>SUB_UPGRADES[k].cost+(k==='engineering'?Math.round(l.km*1000):0);
|
||||
// Pending transmission work follows the construction schedule. Keep the actual
|
||||
// shift (the last crew purchase can save fewer than 30 days) and completed work.
|
||||
function setCableReady(l,ready,day=S.day){const shift=ready-l.ready;
|
||||
function setCableReady(l,ready,day=S.day){const shift=ready-l.ready;layHold(l,shift,day);
|
||||
if(l.kind==='df'&&l.own&&l.sub)for(const k of Object.keys(SUB_UPGRADES)){
|
||||
const f='sub'+k;if(Number.isFinite(l[f])&&l[f]>day)l[f]=Math.max(day+1,l[f]+shift);
|
||||
}l.ready=ready;
|
||||
|
|
|
|||