Pacific islands: twelve cities, island landings and faster transpacific hops

Honolulu, Guam, Koror, Majuro, Port Moresby, Honiara, Noumea, Suva,
Nuku'alofa, Apia, Pago Pago and Papeete, each its own landmass with its
real outline on the map. Exchanges only where one runs today (DRF IX,
Guam IX, Fiji-IXP, CAN'L IXP, Solomon Islands IX); PNG and Tonga have
none active, Samoa's is still planned.

Cables follow real landings: new pairs on Southern Cross, Hawaiki, AJC,
JGA, Bifrost and Humboldt (existing pairs untouched, so saves keep their
links), plus SEA-US, AAG, Echo, HANTRU-1, Coral Sea, Gondwana-1, Tonga
Cable, Tui-Samoa, ASH, Honotua, Manatua and SX NEXT as puns.

Subsea waves have no regens, so a POP on an island splits a crossing into
shorter spans: California-Sydney 400G -> 1.6T per wave via Honolulu and
Suva, LA-Hong Kong/Manila 400G -> 800G via Guam, Santiago-Sydney
400G -> 800G via Tahiti (1.2T on own fiber). LA-Tokyo stays 800G leased:
Honolulu-Guam is just over the 6,000 km 1.6T reach.

Twelve island networks, all with Tier 1 upstreams so Tier 1 players keep
their reach. PacNOG in Suva, unreliable power in Guam, Port Moresby and
Honiara, volcano cuts for Tonga, and the Stepping Stones scenario
(1.6T hop by hop from Los Angeles to Sydney).
This commit is contained in:
Frederic Jung 2026-10-26 13:37:41 +01:00
parent 4682f16730
commit a164b512ba
No known key found for this signature in database
5 changed files with 190 additions and 16 deletions

View file

@ -6,6 +6,7 @@ All notable changes to this project are documented here. The project follows
## [Unreleased]
- Twelve Pacific islands join the map: Honolulu, Guam, Koror, Majuro, Port Moresby, Honiara, Nouméa, Suva, Nuku’alofa, Apia, Pago Pago and Papeete. The cables across the Pacific now stop where they really land, and a POP on an island splits a long crossing into shorter hops that each carry more: California to Sydney goes from 400G to 1.6T per wave via Honolulu and Suva, Hong Kong and Manila to Los Angeles from 400G to 800G via Guam, and Santiago to Sydney from 400G to 800G via Tahiti. Twelve new cables, among them SEA-US Later, Echo-Chamber and Coral Sea Shanty, link the islands, and the old ones gain island stops. Only islands with a real exchange today get one: Honolulu, Guam, Suva, Nouméa and Honiara. Island telcos from Hawaiian Telecombo to Never Too Atoll join the networks, PacNOG meets in Suva every December, Guam, Port Moresby and Honiara have unreliable power, Tonga’s cable has a volcano for a neighbour, and a new scenario, Stepping Stones, asks you to hop the Pacific at 1.6T.
- Big networks are snappier again: working out each day's traffic takes about a third less time on phones and half on desktops, so game days and clicks pause for less. Traffic goes exactly where it went before, and the game makes far less garbage for the browser to clean up.
- Your own subsea cable can no longer be longer than any optic can light (#88). New York to Sydney now says so before you pay, instead of after the ship comes home. Calling off a cable while it is still being laid returns most of the price of the part not laid yet, and an unusable cable from an older save goes back for a full refund.
- Your own IX can now live in either building of a two-site metro, or in both with a second switch, so a dark building no longer takes your exchange down (#36). The LAG buttons that did nothing on your own IX are gone.