Cable ships: club repair ships sail out to subsea cuts, private charters jump the queue, lay ships build your cables

A subsea cut sends the nearest free ship of its region's maintenance club from its port, along the cable routes at about 500 km a day; the cut lasts while it sails, waits for permits in slow countries and splices (3-5 days shallow, 6-12 deep). Ships stay busy until home (S.fleet). With the club's ships all out the cut waits; a private charter of the quickest free ship costs $1M + $200/km sailed. Own subsea builds show survey/factory, then a lay ship at 150 km/day; a second lay ship can be booked before laying ($3M + $150k/day saved), and crews no longer speed up cables at sea. Ships are drawn on the map and can be tapped.
This commit is contained in:
Frederic Jung 2026-11-01 11:24:37 +00:00
parent 1fa5566d66
commit 96e2c2f537
No known key found for this signature in database
28 changed files with 606 additions and 138 deletions

View file

@ -12,7 +12,10 @@ All notable changes to this project are documented here. The project follows
- Cache boxes now share router ports through an aggregation switch: one port carries as many 100G boxes as its speed holds, so 32 fit on a 3.2T port (#252). Each site gets its own.
- Opening a link from a list now moves the map to it, zoomed so the whole line fits beside the open panel.
- Traffic for a carrier now leaves through that carrier's own transit port at the same POP, instead of being shared with every other transit port there. Networks that buy transit from the carrier get the same treatment, and a new switch on each transit port, Carry here, pulls that traffic across your network from POPs that have no port of that carrier. Prefer, Backup only and RouteScript still win, and Prefer only does so at the POP where you set it.
- Hurrying anything at sea now takes a cable ship, and there are only a few dozen in the world, so it costs millions. Speeding up your own subsea cable charters another ship for $3M plus $500 per km for every 30 days saved, and a rush repair on a subsea cut costs $1M plus $200 per km, where a cut on land still costs a few thousand.
- Cable ships now sail out to fix your subsea cables, and you can watch them on the map. A cut at sea calls the nearest free ship of its region's repair club, from ports such as Cornwall, Curaçao, Cape Town, Marseille, Vancouver, Tokyo, Manila and Singapore. The cut lasts while the ship sails out (about 500 km a day), splices for 3 to 5 days in shallow water or a week or two in the deep, and in some countries waits weeks for a repair permit. A ship is busy until it is home again.
- When every ship of a region's club is out, a subsea cut waits for the first one back. A private charter of the quickest free ship anywhere jumps the queue for $1M plus $200 per km it sails; the NOC intern's rush-repair order can pay it within its budget.
- Building your own subsea cable now shows the survey, permits and cable factory first, then a lay ship laying about 150 km a day. Crews can no longer speed up a cable at sea: book a second lay ship before laying starts instead, for $3M plus $150k a day, and it lays from the other end to halve that part.
- Tap a cable ship on the map to see its name, its club and what it is doing.
## [2.3.0] — 2026-10-31