Pay to hurry the permits and factory of your own subsea cable (closes #258)
Before laying starts, seaRush buys 30 days a step (or all of them at once) at $500k plus $60 a km, with the market's build prices. The floor is the factory: 60 days plus a day per ~80 km from the order (prepMin, through leadDays), then the lay ships still need their time at sea, which a second ship still halves. 6,000 km: from 600 days of prep to 132 for about $13M.
This commit is contained in:
parent
4d609d996f
commit
823e4188be
13 changed files with 89 additions and 1 deletions
|
|
@ -6,6 +6,7 @@ All notable changes to this project are documented here. The project follows
|
|||
|
||||
## [Unreleased]
|
||||
|
||||
- You can pay to hurry the survey, permits and factory of your own subsea cable, 30 days at a time (#258). Money only goes so far: the cable still has to be made, about two months plus a day for every 80 km, before the lay ships sail.
|
||||
- Three new cities in northern Australia: Port Hedland, Townsville and Alice Springs (#255). Port Hedland lands a new cable up the coast to Darwin and a branch of Darwin's cable out to Singapore; Alice Springs has no sea at all. In the wet season, November to April, fiber cuts in the tropical north, Darwin included, take twice as long to reach.
|
||||
- Traceroute no longer shows an "embedded cache in your rack" hop on paths that leave over transit, an exchange or a PNI. Only traffic that really ends at one of your cache boxes shows it now.
|
||||
|
||||
|
|
|
|||