- Upgrades take effect: the optic speed cache from #89 is now kept per cable state (subsea, terminals in service, engineering in service), so a cable no longer stays at 400G after both upgrades are commissioned. - Refunds: a cable remembers what was paid for it, design and upgrades included. Calling off a 7x low-latency cable returned 10% of its price. 'Unusable' now means no optic lights it even with both upgrades. - Length limit: #88 counts the shortest design and both upgrades. The order screen says which upgrade a route needs and will not order without it; the order action checks the same. New York to Sydney needs terminals. No leased-wave payback hint where no leased wave reaches. - Choices start fresh when you open the own-cable view and after ordering. - The 'consider terminals or engineering' hint only on cables you own. - Low-latency builds take 1.7x as long (London-New York ~2.9 years), not 3.5x; optimized 1.3x. Each design is one tappable card. - The low-latency factor is worked out once per route instead of on every latency lookup. 'Number.isFinite' alone, no repeated guard in seaQuote, the express factor folded into seaLatencyFactor, '+{n} days' as one translatable string. - Portuguese and French for the new strings; one CHANGELOG bullet (#65). Big network vs main: no slowdowns, identical routing.
This commit is contained in:
parent
e76d68fc90
commit
6ddbc6ec7d
7 changed files with 120 additions and 25 deletions
|
|
@ -2584,4 +2584,20 @@
|
|||
"1.6T on every hop from Los Angeles to Sydney":"1.6T sur chaque saut de Los Angeles à Sydney",
|
||||
"A path from Los Angeles to Tokyo":"Un chemin de Los Angeles à Tokyo",
|
||||
"The Rhine-Ruhr hub: more carrier-neutral data centers than Hamburg or Munich, and an hour from the Dutch border, so fiber to Amsterdam is short and cheap. Order an Altbier here, never a Kölsch.":"Le hub de la Rhénanie-Ruhr : plus de data centers neutres que Hamburg ou Munich, et à une heure de la frontière néerlandaise, donc la fibre vers Amsterdam est courte et pas chère. Ici, on commande une Altbier, jamais une Kölsch.",
|
||||
"Premium submarine terminals":"Terminaux sous-marins premium",
|
||||
"Optical engineering":"Ingénierie optique",
|
||||
"This channel reaches {max} km on this cable; the route is {span} km. Consider submarine terminals or optical engineering.":"Ce canal porte à {max} km sur ce câble ; le tracé fait {span} km. Pense aux terminaux sous-marins ou à l’ingénierie optique.",
|
||||
"Submarine transmission":"Transmission sous-marine",
|
||||
"Better terminals and optical tuning extend long-haul reach. Repeaters are already included; these upgrades do not change latency.":"De meilleurs terminaux et un réglage optique allongent la portée longue distance. Les répéteurs sont déjà inclus ; ces améliorations ne changent pas la latence.",
|
||||
"Ready in {n} days":"Prêt dans {n} jours",
|
||||
"{price} · {n} days":"{price} · {n} jours",
|
||||
"Up to {g} per channel":"Jusqu’à {g} par canal",
|
||||
"Cable design":"Conception du câble",
|
||||
"Standard":"Standard",
|
||||
"Optimized":"Optimisé",
|
||||
"Low latency":"Faible latence",
|
||||
"+{n} days":"+{n} jours",
|
||||
"This design’s route is {km} km: too long for any optics, even with both upgrades. A shorter design can make it.":"Le tracé de cette conception fait {km} km : trop long pour toute optique, même avec les deux améliorations. Une conception plus courte peut y arriver.",
|
||||
"{km} km is too far for your optics on their own. Add {what} to light this cable.":"{km} km, c’est trop loin pour tes optiques seules. Ajoute {what} pour allumer ce câble.",
|
||||
"Estimated latency":"Latence estimée",
|
||||
};
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue