Subsea cable designs, fixed against today's main (#65, #78)

- Upgrades take effect: the optic speed cache from #89 is now kept per cable
  state (subsea, terminals in service, engineering in service), so a cable
  no longer stays at 400G after both upgrades are commissioned.
- Refunds: a cable remembers what was paid for it, design and upgrades
  included. Calling off a 7x low-latency cable returned 10% of its price.
  'Unusable' now means no optic lights it even with both upgrades.
- Length limit: #88 counts the shortest design and both upgrades. The order
  screen says which upgrade a route needs and will not order without it;
  the order action checks the same. New York to Sydney needs terminals.
  No leased-wave payback hint where no leased wave reaches.
- Choices start fresh when you open the own-cable view and after ordering.
- The 'consider terminals or engineering' hint only on cables you own.
- Low-latency builds take 1.7x as long (London-New York ~2.9 years), not
  3.5x; optimized 1.3x. Each design is one tappable card.
- The low-latency factor is worked out once per route instead of on every
  latency lookup. 'Number.isFinite' alone, no repeated guard in seaQuote,
  the express factor folded into seaLatencyFactor, '+{n} days' as one
  translatable string.
- Portuguese and French for the new strings; one CHANGELOG bullet (#65).

Big network vs main: no slowdowns, identical routing.
This commit is contained in:
Frederic Jung 2026-10-26 16:07:08 +01:00
parent e76d68fc90
commit 6ddbc6ec7d
No known key found for this signature in database
7 changed files with 120 additions and 25 deletions

View file

@ -6,6 +6,7 @@ All notable changes to this project are documented here. The project follows
## [Unreleased]
- Your own subsea cables now come in three designs, from the budget route to one as fast as the fastest cable on the map, and two upgrades carry faster channels further (#65). Each design shows its latency, price and build time before you order: optimized costs three times as much and low latency seven times, and both take months longer. Premium terminals and optical engineering light longer routes at higher speeds, so a cable as long as New York to Sydney can now carry traffic, and the order screen tells you which upgrade a route needs. Calling off a cable while it is being laid refunds what you actually paid for it.
- Series of Tubes now speaks French. The game follows your browser's language the first time, and you can switch to Français under Settings or on the title screen.
- PNI buttons now show the monthly port fee next to the one-off setup cost, so a $1.8k cross-connect no longer looks like a monthly bill (#110). Upgrading a PNI shows what the bigger port costs per month too.
- Düsseldorf joins the map with the Altbier-IX (#108). It is Germany's second carrier hub, an hour from the Dutch border, and the networks you meet there are the ones really present: Voda-Phony's home market, Doitsche Telekomm, the big Tier 1s and the clouds.