IPv6-only broadband: 464XLAT city by city, a NAT64 pool next to CGNAT

A broadband city can swap its home routers for ones with a CLAT (ip6Go /
ip6Stop, from the city panel's Home broadband). Over 30 to 180 days an even
share of the homes moves each day, paid as the routers go in ($4 a home),
waiting while cash is short; starting needs only the first day's share. New
homes in a swapping or finished city get the new router at the same price.
The panel says how many addresses it frees and what it does to the monthly
IPv4 bill.

ip4Use splits homes into public, behind CGNAT and IPv6-only: the NAT64 pool
(ceil(IPv6-only homes / NAT64 ratio), 64/128/256, default 128) comes right
after business blocks, before dual-stack homes. NAT64 gateways cost the same
per Gbps of IPv4 as CGNAT boxes; NAT64 refunds sit under CGNAT's at the same
ratio and never reach zero. The IPv4 share of home traffic is now a curve:
0.55 on day 0, two points less a year, floor 0.2. Out-of-space advice names
the sharing left to stretch. Everything is under rule ip4; old saves load
unchanged (no field means dual stack).
This commit is contained in:
jvanvik 2026-11-07 07:01:34 +01:00
parent 3bc1641a46
commit 69328ce257
25 changed files with 812 additions and 54 deletions

View file

@ -6,6 +6,8 @@ All notable changes to this project are documented here. The project follows
## [Unreleased]
- Broadband cities can now go IPv6-only with 464XLAT, a second way to save IPv4 next to CGNAT. Start it from a city's Home broadband, which also says what it does to your monthly IPv4 bill: its home routers are swapped over a month or more, paid as each one goes in (new homes there get one too, at the same price), and the homes then need no IPv4 address of their own, only a share of a NAT64 pool at up to 256 homes per address, with fewer refunds than CGNAT at the same ratio. The bank's Address space section shows your homes as public, behind CGNAT and IPv6-only, with the NAT64 ratio next to the CGNAT one, and says which of the two to stretch when space runs out.
- CGNAT gets a little cheaper every year: the world moves to IPv6 about two points a year, so less of your homes' traffic needs IPv4 and the CGNAT and NAT64 boxes carry less of it.
- The router model and the line system your intern standardizes on are now picked in one place, the build standard. Keep routers ahead and Upgrade optical transport take them from there and say so, with a button to the sheet. With a model or line system in the standard, both orders bring everything up to it and stop there (Upgrade optical transport on every fiber, even at POPs that Keep to the build standard skips); "Keep as is" leaves them to the next one up when busy. A model or line system you had picked in an order that was running moves into your standard, so new POPs get that model too.
- Your intern no longer takes a fiber dark for the build standard just because it looks quiet: like the optical upgrade order, it first checks that every gigabit, circuit and express gets around the fiber for the day. The two orders share one line system swap a night (two for Kevin), never work on the same fiber in one shift, and a wave the standard just upgraded is no longer handed back the same day.
- Whoever runs sales can now answer renewal haggles for you, each in their own way: switch it on at the sales desk. The engineer keeps nerdy customers at the market price and gives everyone else their discount, the shark refuses discounts and some customers walk, and the CEO settles it on the golf course, for better or worse.