Weekly Architect runs: sites outgrow their tubes, and a countdown
A grow brief raises a site's traffic past what its tubes carry; the reference makes room by upsizing the busiest tube, or laying a second one where a long cable cannot grow. Traffic may now reach 380G. The weekly row says when the next run comes out.
This commit is contained in:
parent
4e6e8294d2
commit
5f478dd318
14 changed files with 85 additions and 23 deletions
|
|
@ -1 +1 @@
|
|||
{"v":1,"key":"2026-W45","hq":"maa","budget":920000,"name":{"l":"architect_weekly.name_hq_and_friends","p":{"hq":"maa"}},"joke":{"l":"architect_weekly.joke_one_network_a_handful","p":{}},"briefs":[{"add":["blr"],"dem":{"blr":20},"tubes":1},{"add":["hyd","cbo"],"dem":{"hyd":20,"cbo":20},"tubes":2},{"gold":["cbo"],"tubes":1},{"ring":["maa","blr","hyd"],"tubes":1},{"drop":["hyd"],"add":["mle"],"dem":{"mle":30},"gold":["mle"],"tubes":2},{"gold":["blr"],"tubes":1}],"ref":{"spend":860936,"steps":[[["maa","blr","land"]],[["blr","hyd","land"],["maa","cbo","smw6"]],[["cbo","maa","smw4"]],[["hyd","maa","land"]],[["@rm","hyd"],["cbo","mle","smw6"],["mle","maa","iax"]],[["blr","maa","land"]]]}}
|
||||
{"v":1,"key":"2026-W45","hq":"maa","budget":930000,"name":{"l":"architect_weekly.name_hq_and_friends","p":{"hq":"maa"}},"joke":{"l":"architect_weekly.joke_one_network_a_handful","p":{}},"briefs":[{"add":["blr"],"dem":{"blr":30},"tubes":1},{"add":["hyd","cbo"],"dem":{"hyd":20,"cbo":20},"tubes":2},{"gold":["cbo"],"tubes":1},{"ring":["maa","blr","hyd"],"tubes":1},{"drop":["hyd"],"add":["dac"],"dem":{"dac":20},"gold":["dac"],"tubes":2},{"gold":["blr"],"tubes":1}],"ref":{"spend":869628,"steps":[[["maa","blr","land",1]],[["blr","hyd","land",1],["maa","cbo","smw6",1]],[["cbo","maa","smw4",1]],[["hyd","maa","land",1]],[["@rm","hyd"],["maa","dac","land",1],["dac","maa","land",1]],[["blr","maa","land",1]]]}}
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue