Merge pull request #313: every routing a day needs runs in the route worker, and a long day lets frames through
Conflicts with main resolved: the intern's chosen router model, optical upgrades and personas are generators like the
other orders, with a rest after each job. The optical upgrade's fiber test is a step the day answers, in the route
worker in play (opsDark(), {dark}), like the sales desk's trial; the renewal desk's reroute is a step too (slRenRun()).
This commit is contained in:
commit
410eb81544
28 changed files with 612 additions and 141 deletions
|
|
@ -11,6 +11,7 @@ All notable changes to this project are documented here. The project follows
|
|||
- Your intern can upgrade optical transport: a new standing order moves full, busy fiber to a bigger line system, or trades its smallest channels for bigger optics. Pick a line system, and every fiber on a smaller one is moved up to it. A line system swap takes the fiber down for a day, so the intern only does it where the traffic gets around it and no customer rides it, one a night.
|
||||
- Your intern can standardize your routers on a model you choose: pick it in Keep routers ahead, and every POP on a smaller model is swapped to it, the busiest first, within the monthly budget. Every setting in the Standing orders sheet is now a list to pick from instead of a button to tap through.
|
||||
- France gets seven more cities: Lyon, Toulouse, Lille, Bordeaux, Strasbourg, Rennes and Nantes, all but Nantes with an exchange of their own (#288). SF-Error Telecom and Boy-Egg Telecom bring home broadband and mobile, Ov-Hatch Cloud and Scale-Away bring French clouds, Tangerine Telecom and Free as in Beer reach the new cities, Cogentle reaches Toulouse, Lille, Bordeaux and Strasbourg, and Andorable Telecom comes up to Toulouse. The Atlantic cables now come ashore where they really do: Ami-Tea at Bordeaux and Dunno-ant at Nantes, and Dunno-ant starts at Virginia Beach.
|
||||
- Big networks at ×8 no longer stop for a moment when a day reroutes, after a failure, an event, the intern's shift or the sales desk's signing. Every routing a day needs now runs in the background like the day's own, a long day lets the map draw between its steps, and the check for customers afraid of sharks no longer walks every land fiber for each of them. Quiet notifications now also apply while the game is running.
|
||||
|
||||
## [3.0.0] — 2026-11-06
|
||||
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue