Subsea hurry costs a cable ship: charters for builds, the repair-ship queue for cuts
Speeding up an own subsea cable charters another cable ship ($3M plus $500/km per 30 days saved), and a rush repair on a subsea cut costs $1M plus $200/km. Land crews and trench repairs keep their prices.
This commit is contained in:
parent
bd6ba6bfd7
commit
38fdf9b4d8
14 changed files with 104 additions and 13 deletions
|
|
@ -8,6 +8,7 @@ All notable changes to this project are documented here. The project follows
|
|||
|
||||
- Opening a link from a list now moves the map to it, zoomed so the whole line fits beside the open panel.
|
||||
- Traffic for a carrier now leaves through that carrier's own transit port at the same POP, instead of being shared with every other transit port there. Networks that buy transit from the carrier get the same treatment, and a new switch on each transit port, Carry here, pulls that traffic across your network from POPs that have no port of that carrier. Prefer, Backup only and RouteScript still win, and Prefer only does so at the POP where you set it.
|
||||
- Hurrying anything at sea now takes a cable ship, and there are only a few dozen in the world, so it costs millions. Speeding up your own subsea cable charters another ship for $3M plus $500 per km for every 30 days saved, and a rush repair on a subsea cut costs $1M plus $200 per km, where a cut on land still costs a few thousand.
|
||||
|
||||
## [2.3.0] — 2026-10-31
|
||||
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue