The no-cable hint in the link window names the satellite (#83)
Upstream 3.3's hint for a coast where no subsea cable lands (#321) said only a cable of your own could get to Iqaluit or Adamstown, and left satellites out at Pevek, though a teleport reaches all three. Once teleports are on sale (level 2) and a bird you may rent from sees the city, the 'own' case says a satellite circuit or a cable of your own can get there (a new string), and every case adds the satellite line: the city panel's 'Your teleports can reach' with a button per teleport to its order sheet (satOpen), or where to build one. Not in puzzles, and not before level 2, like the rest of the satellites.
This commit is contained in:
parent
7930d332f1
commit
2dc8274f34
10 changed files with 68 additions and 3 deletions
|
|
@ -6,6 +6,7 @@ All notable changes to this project are documented here. The project follows
|
|||
|
||||
## [Unreleased]
|
||||
|
||||
- Linking to an island or remote town where no subsea cable lands, like Iqaluit or Adamstown, now says that a satellite can get there too. Each of your teleports that reaches it gets a button to its order sheet; without one, the window says where a teleport would have to go (#83).
|
||||
- IPv4 notices in the NOC's notifications, like "Your IPv4 is full", now have an Open button that takes you to the bank's Address space, as the notice's own button does (#150).
|
||||
- In dark mode, red warning text is now a lighter red that reads well on the dark panels, and the capacity market's Hot and Cool tags take the night colours instead of staying bright pastel chips (#80).
|
||||
- The NOC dashboard's connections list no longer breaks when one of your fabric ports is already at 400G, the biggest a fabric port gets: it offers a LAG member instead of an upgrade.
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue