Build standard: never take a fiber dark under a customer's wave; the intern no longer skips leased pairs and IRUs
The build standard's Apply could swap the line system on a fiber that carries a sold alien wave or a Lambda Bazaar managed wave, taking those customers dark for a day with no warning. The intern refused any fiber with any customer on it, leased pairs and IRUs included, though a line-system swap cannot touch them. One helper next to fiberOk(), dfWaveCust(), says whether a customer rides the fiber's line system (every fiber type but glass: dfpair, pairs, capfib), and both bstdDarkOk() and opsDarkPre() use it. bstdPlan() holds such a fiber (J.held) and lists it in J.wv; the sheet and the MCP quote give that reason. The link panel's own upgrade button (ACT.upSys) still swaps with a warning toast.
This commit is contained in:
parent
1f76639b8f
commit
286ae48207
14 changed files with 102 additions and 24 deletions
|
|
@ -9,6 +9,7 @@ All notable changes to this project are documented here. The project follows
|
|||
- Linking to an island or remote town where no subsea cable lands, like Iqaluit or Adamstown, now says that a satellite can get there too. Each of your teleports that reaches it gets a button to its order sheet; without one, the window says where a teleport would have to go (#83).
|
||||
- IPv4 notices in the NOC's notifications, like "Your IPv4 is full", now have an Open button that takes you to the bank's Address space, as the notice's own button does (#150).
|
||||
- In dark mode, red warning text is now a lighter red that reads well on the dark panels, and the capacity market's Hot and Cool tags take the night colours instead of staying bright pastel chips (#80).
|
||||
- "Bring everything up now" in the build standard no longer takes a fiber dark for a day while a customer's alien or managed wave rides it. Such a fiber keeps its line system and the sheet says why; the upgrade button on the fiber itself still does it when you choose. Your intern waits for those fibers too, but no longer skips fibers that only carry leased pairs or IRUs, which a line system swap never touches.
|
||||
- The NOC dashboard's connections list no longer breaks when one of your fabric ports is already at 400G, the biggest a fabric port gets: it offers a LAG member instead of an upgrade.
|
||||
- Broadband cities can now go IPv6-only with 464XLAT, a second way to save IPv4 next to CGNAT. Start it from a city's Home broadband, which also says what it does to your monthly IPv4 bill: its home routers are swapped over a month or more, paid as each one goes in (new homes there get one too, at the same price), and the homes then need no IPv4 address of their own, only a share of a NAT64 pool at up to 256 homes per address, with fewer refunds than CGNAT at the same ratio. The bank's Address space section shows your homes as public, behind CGNAT and IPv6-only, with the NAT64 ratio next to the CGNAT one, and says which of the two to stretch when space runs out.
|
||||
- CGNAT gets a little cheaper every year: the world moves to IPv6 about two points a year, so less of your homes' traffic needs IPv4 and the CGNAT and NAT64 boxes carry less of it.
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue