The intern's shift report opens the Standing orders sheet (#226)
Its NOC notification pointed at the NOC tab, where the notification already is, so Open did nothing. It now opens the Ops sheet, which holds the report.
This commit is contained in:
parent
2d7aff4956
commit
198c636442
6 changed files with 21 additions and 4 deletions
|
|
@ -9,6 +9,7 @@ All notable changes to this project are documented here. The project follows
|
|||
- Premium submarine terminals and Optical engineering can no longer be bought on a cable where they would change nothing (#198). The button now says so, and an upgrade that only helps together with the other one stays available.
|
||||
- A wave size that is sold out on a route can no longer be reached by upgrading a smaller wave on it (#201). The upgrade button says how long it is sold out, just like when buying.
|
||||
- Choosing Both for a PNI with one member now really splits it: the second member arrives in the other building when the augment lands, instead of joining the first (#219).
|
||||
- The Open button next to your intern's weekly shift report in the NOC now opens the Standing orders sheet, where the whole week is laid out (#226). Before, it did nothing.
|
||||
|
||||
## [2.0.0] — 2026-10-30
|
||||
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue