A plug-in optic too short for a subsea cable is no longer sent to upgrades that cannot stretch it (closes #253)
On an own subsea cable, the hint under an optic that cannot reach the route said "Consider submarine terminals or optical engineering" for every optic. Those upgrades only lengthen the Sienna WaveMagic 1.6T and 3.2T transponder modes (optModes()); the 400ZR+ and 800ZR+ plug-ins gain nothing, also with both upgrades in service. Perth to Cape Town (8,891 km) showed it: 800ZR+ reaches 5,400 km and the advice was to buy $17M of upgrades that change nothing. chWhy() now asks whether the optic would reach with both upgrades in service (withSubUps()). If so, the advice stays. If not, the hint says the upgrades do not stretch this optic and names the optics that do reach the route. A consortium seat and a leased line keep their own message.
This commit is contained in:
parent
66aaaec5f1
commit
0bf27a66c7
10 changed files with 93 additions and 1 deletions
|
|
@ -11,6 +11,7 @@
|
|||
"action_helpers.this_channel_reaches_max_km_on":"Este canal alcança {max} km neste cabo; a rota tem {span} km. Considere terminais submarinos ou engenharia óptica.",
|
||||
"action_helpers.too_far_even_at_its_slowest":"Longe demais até na configuração mais lenta: um span óptico aqui tem {span} km e ela alcança {max} km. Adicione um site de regeneração (Line system).",
|
||||
"action_helpers.unlocks_at_customer_level_n":"Desbloqueia no nível de cliente {n}.",
|
||||
"action_helpers.upgrades_cannot_stretch_this_optic":"Este canal alcança {max} km neste cabo; a rota tem {span} km. Terminais submarinos e engenharia óptica não esticam esta óptica. Estas chegam lá: {optics}.",
|
||||
"actions.your_router_can_t_take_a":"<b>Seu router não aguenta uma porta {port}.</b><br>Faça upgrade na aba Infra.",
|
||||
"architect.anchor":"🐒 Tchibum!",
|
||||
"architect.architect_runs":"Partidas de arquiteto",
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue